We study the following lot-sizing models that recently appeared in the literature: a lot-sizing model with a remanufacturing option, a lot-sizing model with production time windows, and a lot-sizing model with cumulative capacities. We show the equivalence of these models with a classical model: the lot-sizing model with inventory bounds.