<?xml version="1.0" encoding="UTF-8" standalone="no" ?>
<rss version="2.0">
  <channel>
    <title>Kubiak, W.</title>
    <link>http://repub.eur.nl/res/aut/14676/</link>
    <description>List of Publications</description>
    <language>en</language>
    <image>
      <url>http://repub.eur.nl/static-eur/img/logo.png</url>
      <title>RePub, Erasmus University Rotterdam</title>
      <link>http://repub.eur.nl</link>
    </image>
    <item>
      <title>Scheduling with deteriorating jobs to minimize makespan (Article)</title>
      <link>http://repub.eur.nl/res/pub/12337/</link>
      <pubDate>1998-01-01T00:00:00Z</pubDate>
      <description>We consider a single-machine problem of scheduling n independent jobs to minimize makespan, in which the processing time of job Jj grows by wj with each time unit its start is delayed beyond a given common critical date d. This processing time is pj if Jj starts by d. We show that this problem is NP-hard, give a pseudopolynomial algorithm that runs in  time and O(nd) space, and develop a branch-and-bound algorithm that solves instances with up to 100 jobs in a reasonable amount of time. We also introduce the case of bounded deterioration, where the processing time of a job grows no further if the job starts after a common maximum deterioration date D &gt; d. For this case, we give two pseudopolynomial time algorithms: one runs in O(n2d(D - d)  time and O(nd(D - d)) space, the other runs in  pj)2) time and  pj) space</description>
    </item>
  </channel>
</rss>