A spare parts stocking policy based on equipment criticality
1998-09-20
Article
pp 69-77.
This publication is part of collection
| Related Files |
|---|
|
Redirect to publisher's version
(publisher's version.url.txt, 51 bytes) |
Repository contains one additional file which is not publicly available
Demand for spare parts can sometimes be classified into critical and non-critical demand, depending on the criticality of the equipment in which it is installed. To effectively handle this situation in spare parts inventory control, we propose a stocking policy where some of the stock is reserved for critical demand. For Poisson demand and a lot-for-lot stocking policy with a deterministic replenishment lead time, approximations of the service levels for both classes of demand are derived, and verified by simulation. Finally, a numerical example is presented to illustrate the advantages of using the proposed policy.
Keywords