Preventive maintenance in a 1-out-of-n system: the uptime, downtime and costs
1997-06-16
Article
pp 565-583.
| Related Files |
|---|
|
(eur_dekker_27.pdf, 1.0MB) |
|
Redirect to publisher's version
(publisher's version.url.txt, 51 bytes) |
In repairable systems with redundancy, failed units can be replaced by spare units in order to reduce the system downtime. The failed units are sent to a repair shop or manufacturer for corrective maintenance and subsequently are returned for re-use. In this paper we consider a 1 out of n system with cold standby and we assume that repaired units are "as good as new".
Keywords
Automatically Extracted Terms
- maintenance
- system
- approximation
- downtime
- dekker /european journal
- model
- uptime
- distribution
- failure
- error
- research
- n system
- smith
- journal
- probability
- dekker
- 565-583
- m.a.j
- availability
- /european