More and more supply chains emerge that include a return flow of materials. Many original equipment manufacturers are nowadays engaged in the remanufacturing business. In many process industries, production defectives and by-products are reworked. These closed-loop supply chains deserve special attention. Production planning and control in such hybrid systems is a real challenge, especially due to increased uncertainties. Even companies that are engaged in remanufacturing operations only, face more complicated planning situations than traditional manufacturing companies. We point out the main complicating characteristics in closed-loop systems with both remanufacturing and rework, and indicated the need for new or modified/extended production planning and control approaches. An overview of the existing scientific contributions is given. It appears that we only stand at the beginning of this line of research, and that many more contributions are needed and expected in the future.

,
hdl.handle.net/1765/1710
Econometric Institute Research Papers
Erasmus School of Economics

Inderfurth, K., & Teunter, R. (2001). Production planning and control of closed-loop supply chains (No. EI 2001-39). Econometric Institute Research Papers. Retrieved from http://hdl.handle.net/1765/1710