New lower and upper bounds for scheduling around a small common due date


Article
pp 102-110.
This publication is part of collection
Related Files
asset icon
(NewLowerandUpper_1994.pdf, 0.7MB)

We consider the single-machine problem of scheduling n jobs to minimize the sum of the deviations of the job completion times from a given small common due date. For this NP-hard problem, we develop a branch-and-bound algorithm based on Lagrangian lower and upper bounds that are found in O(n log n) time. We identify conditions under which the bounds concur; these conditions can be expected to be satisfied by many instances with n not too small. In our experiments with processing times drawn from a uniform distribution, the bounds concur for ≥ 40. For the case where the bounds do not concur, we present a refined lower bound that is obtained by solving a subset-sum problem of small dimension to optimality. We further develop a 4/3-approximation algorithm based upon the Lagrangian upper bound.



Keywords